The Job
Shuffled the schedule. Eight people, different strengths. Divided the work to match. Sheet metal personnel stepped in on insulation and duct runs. When the equipment was ready to fire, the control system needed internet — and the data company was months out. Sourced a cellular router, got connectivity, completed startup. Small punch list on controls after the fact. Jumped on it. Haworth keeps calling us back.
The Work
Large ductwork and refrigerant installation, controls integration, cellular connectivity workaround to meet certificate of occupancy deadline.