Forest Grove Primary Treatment Project

Project Details

Project Type Commercial HVAC
Industry Water & Wastewater Infrastructure
Location Forest Grove
Fan and fiberglass duct assembly being positioned by crane against a blue sky

The Scope

Commercial HVAC and odor control installation for the Forest Grove Primary Treatment Project, a $50 million water infrastructure. The project added two new 100′ clarifiers, a flow control structure, lime silo, alum building, and biofilter to the facility. Our crew handled the mechanical work tied to two new digesters and new electrical rooms, including:

  • Two foul air fans cut into the existing facility for odor control
  • Odor control systems handling corrosive, high-toxicity chemicals
  • AC and exhaust fan installation
  • 46″ fiberglass ductwork, fabricated with epoxy resin sheet joints built up to hold a tight seal under demanding conditions
Crane lifting large fiberglass duct section into place at a treatment plant construction site

The Challenge

This job required close coordination with the electrical trade on motor control center panels tied to building management systems — control board monitoring, high-heat alarms, and fan switch controls all had to be mounted, wired, and commissioned to work together. The site stayed busy throughout, with multiple trades stacked during the project’s peak period, so sequencing and communication with the GC’s schedule were critical. Precise grading and layout work — shooting grade and laser lines to get the correct drop on duct runs — was essential to getting the ductwork installed correctly the first time.

Large white fiberglass exhaust ductwork with flanged elbow joints

The Result

Santiam’s installation and service teams hit every GC timeline milestone despite the compressed schedule, and every system performed as designed at startup. The work supports long-term water infrastructure for the Forest Grove community.