Klamath Falls Wastewater Treatment — Phase 3

FRP resin cures at 60 degrees. We were working in the teens.

Project Details

Project Type Commercial HVAC
Industry Water & Wastewater Infrastructure
Location Klamath Falls
Timeline 3 - 6 months

The Job

Odor control and fresh air systems for a headworks building. High-volume FRP ductwork for foul air fans, aluminum ductwork for fresh air, heating and cooling units for electrical and pump rooms. FRP resin won’t set up below 60 degrees. We were in the teens, wind chill included. Set up tents. Heating pads, torches, heat guns. Stayed on it through the winter. Hit the completion date.

Not many shops do large-scale FRP. Slayden noticed. We’ve done more work with them since.

The Work

High-volume FRP ductwork, odor control systems, fresh air systems, electrical and pump room HVAC.