The Job
Large air handling units. Exposed ductwork. Layout coordination with ironworkers, brick layers, roofers, and electrical. Ductwork was too large to fabricate in-house. Sourced from a Portland shop we trust. Controls were complex and time-consuming — new technology that hadn’t been set up this way before. Worked through it. Units came online just in time to hold temperature in rooms full of electrical gear that can’t exceed 72 degrees.
The Work
Large air handling units, exposed ductwork, multi-trade coordination, new-technology control systems.